“New Industrialised Construction Process for transport infrastructures based on polymer composite components.”
Programme: 7th Framework Programme
Duration: 1.06.2009 – 31.05.2013
The overall objective of the project is to develop a cost-effective integrated construction process that will enable the maximum capability of industrialisation of components for transport infrastructures (road and pedestrian bridges, underpass, containing walls, acoustic and safety barriers) using polymer based materials (carbon fibre, glass fibre, etc): the Trans-IND System. Project integrates the whole construction process fulfilling users and clients demands addressing their needs and requirements, social acceptance, standardization, on-site needs, nD industrial models, design, procurement, manufacturing process, logistics and assembly/disassembly.